Germany's nuclear waste disposal challenge is a textbook case of generational cost transfer. The country operated 19 commercial nuclear power plants over decades, shut the last one in 2023, and now faces the bill: 28,000 cubic meters of radioactive material that will remain hazardous for up to one million years, sitting in interim storage with no permanent home. The Federal Company for Radioactive Waste Disposal (BGE) has spent nearly a decade narrowing the search. This week it announced that only 5% of German territory — spread across 11 of 16 states — remains under geological consideration. The criteria are strict: a stable rock formation at 400 meters depth, surrounded by a 100-meter-thick natural barrier of clay, granite, or rock salt, impervious to groundwater contamination over geological timescales. A final site is not expected before 2050. The interim bill is staggering. Storage and search operations currently cost approximately €1.4 billion per year. The completed repository is estimated at €14 billion. These costs are borne by the public after a 2017 deal shifted long-term liability from utilities to a government-managed fund. The waste remains distributed across decommissioning reactor sites and research facilities — a dispersed, vulnerable arrangement. Finland is the only country to have solved this problem, approving its Onkalo repository 400 meters underground after a 40-year process. BGE spokesperson Dagmar Dehmer credits Finland's success partly to high public trust in government institutions, particularly the STUK regulatory authority. Germany, with its fractious nuclear politics dating to the 1970s anti-nuclear movement, faces a fundamentally different social terrain. Environment Minister Carsten Schneider (SPD) is exploring whether the search timeline can be compressed. The government claims Germany is "among the leading countries" behind Finland, ahead of Russia, the US, the UK, and Japan. That framing is generous — being second-worst is not the same as being second-best. No site is selected, no construction has begun, and the geological evaluation alone has decades to run. The core extraction dynamic is temporal: benefits of nuclear electricity were consumed by past generations, while the disposal costs — financial, environmental, and political — cascade forward indefinitely. Every year without a permanent repository adds roughly €1.4 billion in holding costs and extends the period during which waste sits in less-secure interim storage near population centers. The honest question is whether democratic societies can execute infrastructure projects on million-year timescales. Finland managed it through institutional trust and consistency. Germany's path requires sustained political will across dozens of electoral cycles, community acceptance in whichever region is eventually selected, and geological confidence that no human institution has ever been asked to guarantee.