NASA's Neil Gehrels Swift Observatory re-entered Earth's atmosphere over North Sumatra, Indonesia on Wednesday at 12:39 UTC, ending a 22-year mission that was originally planned to last two. Most of the 1,452-kilogram spacecraft burned up during re-entry, though NASA acknowledged some components may have survived. No ground damage was reported. Swift was a genuine overperformer. Launched in 2004 on a $500 million budget to study gamma-ray bursts for two years, it ran 11 times longer than planned. It carried three telescopes and contributed to nearly 7,000 published scientific papers, studying supernovae, black holes devouring stars, stellar X-ray flares, asteroids, and comets. By any reasonable accounting, the public got extraordinary returns on this investment. The satellite was still in good working condition when it died. Its orbit decayed not from equipment failure but from powerful geomagnetic storms triggered by solar eruptions — a natural hazard that accelerated atmospheric drag on the spacecraft. This is the kind of risk that orbital infrastructure faces during solar maximum periods, and it highlights a gap in how aging but functional space assets are protected. NASA's attempted rescue is the more instructive story. In July, the agency contracted private company Katalyst Space to raise Swift's altitude using LINK, a three-armed robotic servicing spacecraft. The mission failed when LINK lost attitude control shortly after reaching space and began spinning uncontrollably. The rescue vehicle itself fell back to Earth in September. Swift ceased operations on October 20. The failed rescue exposes the immaturity of commercial on-orbit servicing. The concept — extending satellite life by sending repair or reboost vehicles — is central to NASA's strategy for sustainable space operations and the commercial space sector's pitch for new revenue streams. LINK's failure is a data point, not a death sentence, but it's a significant one for an industry selling capability it hasn't yet reliably demonstrated. The broader question is about infrastructure planning. NASA has no replacement for Swift in the pipeline with equivalent multi-wavelength capability. The observatory's death leaves a gap in high-energy astrophysics observing capacity that won't be filled quickly. Space telescopes take a decade or more from conception to launch, and the loss of a still-functional instrument to a preventable orbital problem — one where the rescue option existed in theory but not in practice — is a policy failure as much as a technical one. The $500 million sunk cost is already recouped many times over in science. The real cost is the forward-looking capability gap and the lesson that commercial orbital servicing isn't ready to backstop aging national assets.