
RS-25 ENGINES / CORE
4
LAST LUNAR LANDING
1972
ARTEMIS MISSION №
III
VAB VISIT YEAR
2026
NASA astronaut Andre Douglas visited the Vehicle Assembly Building at Kennedy Space Center on November 17, 2026, where he stood inside an RS-25 engine test article. Douglas is assigned as mission specialist for Artemis III, the mission intended to return humans to the lunar surface for the first time since Apollo 17 in 1972.
Extraction Map
The visit is standard pre-mission familiarization — astronauts routinely tour the facilities where their launch hardware is assembled and tested. The RS-25 engines, originally developed for the Space Shuttle program, power the core stage of NASA's Space Launch System (SLS), the heavy-lift rocket designed for deep-space missions. Each SLS core stage uses four RS-25 engines. Artemis III is the marquee mission of NASA's Artemis program, designed to land astronauts on the Moon's south polar region. The mission depends on multiple components coming together: the SLS rocket, the Orion spacecraft, and SpaceX's Starship Human Landing System. Each represents a different contracting model and timeline risk. Douglas's presence at the VAB signals continued forward momentum on mission preparation, though the Artemis program has faced repeated schedule slips. The original target for Artemis III was 2025, and the program's timeline remains subject to hardware readiness across multiple contractors and NASA centers. The RS-25 engines represent a particular case study in aerospace reuse and institutional continuity. Aerojet Rocketdyne (now part of L3Harris) manufactures the engines, which trace their lineage back to the 1970s. The engines have been adapted from reusable Shuttle-era hardware to expendable SLS configuration — a transition that raises questions about cost efficiency but ensures proven reliability. This photo opportunity, while light on technical news, serves a public communications function: it puts a named astronaut next to tangible hardware, making the abstract Artemis timeline concrete for the public. Whether the program delivers on that promise depends on factors far beyond any single astronaut's VAB tour.
Worth reading?
SKIP
Score
36
/100
Mixed — Artemis is generative in its stated goal of building new deep-space capability, but the RS-25 reuse model and cost-plus contracting introduce significant extractive overhead that limits how much new value per dollar actually reaches the frontier.
What Is GRIN?
GRIN stands for Generativity, Resilience, Innovation efficiency, and Novelty openness. These four dimensions capture the essential characteristics of any memetic intelligence — whether a nation, a corporation, a religion, or a movement.
About GRINGenerativity
2/5
Resilience
2/5
Efficiency
1/5
Novelty
2/5
Extractive
3/5
Inverted
Does this create new capability or just redistribute existing value?
Modest new capability. Artemis III aims to return humans to the Moon, but SLS relies on 1970s RS-25 engines in expendable mode — generating less new technology per dollar than commercial alternatives.
Verified Facts (4)
NASA astronaut Andre Douglas is Artemis III mission specialist
Douglas stood inside an RS-25 engine test article
Visit occurred at the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida
Visit date was Tuesday, November 17, 2026
More latest news
Read all